Home / Guides

The FLHA template, and what each field is actually for

A field level hazard assessment is the crew writing down, before they start, what is going to hurt somebody on this task today and what they are doing about it. Below is the template, field by field, and the three that get filled in wrong most often.

Copy it into whatever you use now. It is the same set of fields whether you run it on paper, in a spreadsheet, or on a phone.

The template

Date and shift
The day, and the start time. An FLHA covers one shift, not a week.
Crew and site
Which crew, and where the work is happening. Specific enough that somebody who was not there can find the location later.
Assessed by
The person who ran the assessment, usually the foreman or the lead hand covering for them. Name and role, not initials.
Task and scope
What the crew is actually doing. "Deck pour, grid 4 to 7" beats "concrete work".
Hazards, per step
Break the task into steps and list what can hurt somebody at each one. Most missed hazards are missed because the task was assessed as one lump.
Risk rating
Likelihood against severity, for each hazard, before controls. This is what tells you which hazard gets the most attention.
Controls
What you are doing about each hazard, in order of the hierarchy: eliminate, substitute, engineer, administrate, then PPE. PPE last, because it is the weakest.
Residual risk
The rating again, after the controls. If it is still high, the work does not start yet.
Crew signatures
Every person doing the work, signed before they start. Including anyone who joins later in the day.
Changes during the shift
What changed, when, and what you did about it. This is the field that turns an FLHA into a live document instead of a 6am snapshot.

The three fields that go wrong

Hazards listed for the task instead of the step

"Working at height" is a category, not a hazard. Break the task down and the real ones surface: the anchor point is on the wrong side of the beam, the ladder lands in the path the material hoist swings through, the edge is unguarded for the twenty minutes between the forms coming off and the rail going up. Those are the ones that hurt people, and a task-level assessment never finds them.

Controls that are all PPE

If the control column reads hard hat, gloves, glasses, high-vis for every hazard on the sheet, the assessment has not been done. PPE is the last line, and it only limits the damage after everything else has failed. Ask what would remove the hazard, then what would guard it, then what would change the sequence, and only then what the worker wears.

Signatures collected at the end of the day

An FLHA signed at quitting time is a filing exercise. The signature means the worker was briefed before the work, so if it is collected afterwards it records nothing that was true at the time. This is also the single most common gap an inspector finds, because the timestamps give it away.

On re-assessment: the trigger is not the clock, it is change. New task, new equipment, weather turning, another trade moving into your area, or a hazard nobody listed this morning. Any of those and the assessment gets revisited with the crew before work continues.

Common questions

What does FLHA stand for?

Field level hazard assessment. It is the assessment the crew does at the work face, for the task they are about to start, on the day they are about to start it. Some companies call it an FLRA, a field level risk assessment, or a job hazard analysis. The name changes and the job does not.

Who has to sign an FLHA?

Everyone doing the work covered by it, plus whoever assessed it. A signature is the worker saying they were told what the hazards are and what the controls are. If somebody joins the crew at ten in the morning, they sign before they start, and the assessment gets revisited with them.

How often does an FLHA need to be redone?

Once per crew per shift as a baseline, and again whenever the work changes. New task, new equipment, weather turning, another trade moving into the same area, or a hazard nobody listed in the morning all trigger a re-assessment. An FLHA written at 6am for a job that changed at 11am is not covering the afternoon.

Is an FLHA the same as a toolbox talk?

No. A toolbox talk is a briefing on a safety topic, often the same topic across several crews. An FLHA is specific to one crew, one task, one shift, and it records the hazards of that job and the controls for them. Many crews run the toolbox talk and the FLHA back to back at the start of the shift, but they are separate records.

Where the paper version breaks down

The template is not the hard part. Keeping it current is. A paper FLHA lives in a truck cab, which means the afternoon change never gets written on it, the crew member who started at ten never signs it, and when a regulator asks for six months of them somebody spends a week in a filing cabinet. What is written on the form is usually fine. What happened to the form after 6am is the problem.

MusterHQ runs the same assessment from the crew's phone: the foreman builds it, the crew signs it on site before work starts, anyone joining later signs from their own phone, and a change during the shift prompts a re-check with everyone who already signed. Every version is timestamped, so the record shows what was known when, rather than what somebody remembered at the end of the week. What Alberta OH&S asks for, and where it lives in Muster maps this against the regulator's actual expectations.

See it run on a real shift

Open the live demo and walk your own crew through an FLHA. No signup, and nothing to install.

MusterHQ · Toolbox talks · Due diligence · Compliance · Pricing · Start a pilot